DivisionsTender Ref. no.Name of WorkDepartment Floated onCorrigendum(s)
Facilities Management Division, BangaloreFM/NEP/INT/06/17-18Conducting Energy Audit in Aircraft Division, HAL(BC).Works30 Aug 2017Corrigendum(s) 1
Facilities Management Division, BangaloreFM/NCP/28/17-18Construction of LCH Hangars-Structural Assembly Hangar, Equipping Hangar and Relocation of Power Run area in Helicopter Division, HAL (HC), Bengaluru-[Including Electrical & Mechanical Works].Works11 Sep 2017Corrigendum(s) 1
Engine Division, BangaloreE/DM(PUR)/44523911/17-1Procurement of Safely Shoes & SocksIMM22 Sep 2017Corrigendum(s) 2
Rotary Wing Research & Design CentreRC/IMM/CMGUN/8422LRU/9/1Cabin Mounted 12.7mm Heavy Machine Gun for Advanced Light HelicopterIMM12 Sep 2017Corrigendum(s) 1
Rotary Wing Research & Design CentreRC/IMM/ADELT/8422LRU/15/1Automatic Deployable Emergency Locator Transmitter (ADELT) for ALHIMM21 Sep 2017Corrigendum(s) 1
Facilities Management Division, BangaloreFM/NEP/INT/04/17-18Replacement of H.T. Meter Cubical at Airport Service Centre, HAL BC.Works10 Aug 2017Corrigendum(s) 1
Corrigendum(s) 2
Helicopter Division, BangaloreH/CM(IMM)/EQPT/RFQ/927/17Supply/Installation/Commissioning of Link Harness for Automatic Wiring AnalyserIMM18 Sep 2017Corrigendum(s) 1
Corrigendum(s) 2
Helicopter Division, BangaloreH/CM(IMM)/EQPT/RFQ/917A/17Supply/Installation/Commissioning of G-CODE Post Processor and Machine Simulation SolutionIMM14 Sep 2017Corrigendum(s) 1
Corrigendum(s) 2
Aerospace Composites DivisionHAL/ACD/OS/C422ALH1002 Ver.01Fabrication and Supply of Composite Parts & Assembly (ALH Inlet Air Intake)Outsourcing17 Aug 2017Corrigendum(s) 1
Aerospace Composites DivisionHAL/ACD/OS/C422LCA-1002 VER.01Manufacture of LCA Composite Parts (including Tooling ) & Painting -Spars & othersOutsourcing17 Aug 2017Corrigendum(s) 1
Aerospace Division, BangaloreHAL/ASD/NIT-052/17-18Annual maintenance contract (AMC) for operation & maintenance of equipment and its accessories at STP, ETP, Process shop and new chemical milling shop at Aerospace division for a period of twenty-four (24) months as per scope of work in the tender documentPlant Maintenance22 Sep 2017Corrigendum(s) 1
Aerospace Composites DivisionHAL/ACD/OS/C422LCA1007 Ver.02Trimming of LCA Composite PartsOutsourcing11 Sep 2017Corrigendum(s) 1
Corrigendum(s) 2
Aerospace Composites DivisionRFQ-CNC/ACD/141/17CNC 5-Axis Machining CentreIMM28 Aug 2017Corrigendum(s) 1
Corrigendum(s) 2
Aerospace Composites DivisionRFQ-ATL/ACD/140/17Automated Tape Laying MachineIMM28 Aug 2017Corrigendum(s) 1
Aerospace Composites DivisionHAL/ACD/OS/C422ALH-1066 VER.01Manufacturing of Composite Parts ( ALH Horizontal Stabilizer, End Plates & Aft Box Assy Fin)Outsourcing17 Aug 2017Corrigendum(s) 1
Aerospace Composites DivisionHAL/ACD/OS/C422ALH-1072 Ver. 01Painting of ALH Composite PartsOutsourcing30 Aug 2017Corrigendum(s) 1
Corrigendum(s) 2
Aerospace Composites DivisionHAL/ACD/OS/C422LCA-1004 VER.01Manufacture of LCA Composite Parts (including tooling) & Painting -Drop Tanks & OthersOutsourcing17 Aug 2017Corrigendum(s) 1
Rotary Wing Research & Design CentreRC/IMM/MICU/8422LRU/10/1Medical Intensive Care Unit (MICU) for Advanced Light HelicopterIMM12 Sep 2017Corrigendum(s) 1
Corrigendum(s) 2
Corrigendum(s) 3
Rotary Wing Research & Design CentreRC/IMM/SSDVR/8422LRU/11/1Digital Video Recording System (SSDVR) for Advanced Light HelicopterIMM12 Sep 2017Corrigendum(s) 1
Corrigendum(s) 2
Rotary Wing Research & Design CentreRC/IMM/HOMER/8422LRU/14/1SAR DF Homer System for Advanced Light HelicopterIMM21 Sep 2017Corrigendum(s) 1
Corrigendum(s) 2
Rotary Wing Research & Design CentreRC/IMM/PRS/8422LRU/5/1Request for Quotation (RFQ) for Pressure Refueling System for Advanced Light HelicopterIMM18 Sep 2017Corrigendum(s) 1
Corrigendum(s) 2
Corrigendum(s) 3
Rotary Wing Research & Design CentreRC/IMM/TCAS1/8422LRU/12/1TRAFFIC ALERT AND AVOIDANCE SYSTEM (TCASI) FOR ALHIMM19 Sep 2017Corrigendum(s) 1
Corrigendum(s) 2
Rotary Wing Research & Design CentreRC/IMM/AIS/8422LRU/8/1Automatic Identification System for ALHIMM18 Sep 2017Corrigendum(s) 1
Corrigendum(s) 2
Facilities Management Division, BangaloreFM/NCP/17/17-18Collection, Transportation, Handling and Disposal of Garbage and Mixed Rubbish from Aircraft Division to outside HAL Area, HAL (BC)Works09 Aug 2017Corrigendum(s) 1
Facilities Management Division, BangaloreFM/NCP/16/17-18Service/ Rate Contract for Operation and Maintenance of Organic Waste Converter(OWC) for Composting the Wet Waste from Senior Officer Quarters and C & D Quarters, HAL(BC)Works09 Aug 2017Corrigendum(s) 1
Airport Services CentreHAL/ASC/G01/2017Supply, Installation, Testing & Commissioning (SITC) of Air Traffic Management Automation System (ATMAS) & Subsystems at HAL Airport, Bangalore, Qty-01 set as per Enhancement & Modernization Program of HAL ATM Automation, Surveillance & Information Systems (EMPHASIS)Purchase05 Sep 2017Corrigendum(s) 1
Facilities Management Division, BangaloreFM/NCP/13/17-18Service Contract-Drivers at Aircraft Division, HAL(BC)Works01 Aug 2017Corrigendum(s) 1
Corrigendum(s) 2
TARDC, KanpurHAL/KNP/DO-228/GC/004Procurement of Glass Cockpit (Flight Deck) on DO-228 aircraftIMM12 Sep 2017Corrigendum(s) 1
Corrigendum(s) 2
Facilities Management Division, BangaloreFM/NEP/INT/03/17-18Providing Air-conditioning facility to Advance System Lab (ASL) at Aircraft Division, HAL(BC)Works31 Jul 2017Corrigendum(s) 1
Corrigendum(s) 2
Corrigendum(s) 3
Facilities Management Division, BangaloreFM/NCP/12/17-1802 No. of Civil Works at HAL(BC) as mentioned in the Tender NoticeWorks18 Jul 2017Corrigendum(s) 1
Rotary Wing Research & Design CentreRC/DGM(IMM)/RFI/LANDING GEAR-IMRH/2017REQUEST FOR INFORMATION (RFI) FOR REVIEW OF LANDING GEAR SYSTEM DESIGN FOR INDIAN MULTI ROLE HELICOPTER (IMRH) PROGRAMMEIMM30 Aug 2017Corrigendum(s) 1
Corrigendum(s) 2
Rotary Wing Research & Design CentreRC/DGM(IMM)/RFI/BLADEFOLDING/2017Request for Information (RFI) for Development of Blade Folding System for INDIAN MULTI ROLE HELICOPTER (IMRH) PROGRAMMEIMM30 Aug 2017Corrigendum(s) 1
Corrigendum(s) 2
Aerospace Composites DivisionHAL/ACD/OS/C422LCA-1003 Ver. 02Painting of LCA Composite Components at ACD, HALOutsourcing07 Jun 2017Corrigendum(s) 1
Rotary Wing Research & Design CentreRC/DGM(IMM)/RFI/ENGINE-IMRH/2017REQUEST FOR INFORMATION (RFI) FOR SUPPLY OF SUITABLE TURBO SHAFT ENGINE FOR INDIAN MULTI ROLE HELICOPTER (IMRH) PROGRAMMEIMM28 Aug 2017Corrigendum(s) 1
Corrigendum(s) 2
Corrigendum(s) 3
Corrigendum(s) 4
Rotary Wing Research & Design CentreRC/DGM(IMM)/RFI/ROTORSYSTEM/2017REQUEST FOR INFORMATION (RFI) FOR TECHNICAL CONSULTANCY ON ROTOR SYSTEM FOR 10 TO 12 TON AUW CLASS INDIAN MULTI ROLE HELICOPTER (IMRH) PROGRAMMEIMM30 Aug 2017Corrigendum(s) 1
Corrigendum(s) 2
Corrigendum(s) 3
Rotary Wing Research & Design CentreRC/DGM(IMM)/RFI/TRANSMISSION-SYSTEM/2017REQUEST FOR INFORMATION (RFI) FOR REVIEW OF TRANSMISSION SYSTEM OF INDIAN MULTI ROLE HELICOPTER (IMRH) PROGRAMMEIMM30 Aug 2017Corrigendum(s) 1
Corrigendum(s) 2
Corrigendum(s) 3
Sukhoi Engine Division, KoraputHBS/16UD-1024/1-47Metallic Teflon Assembly Valve Part No 2220.190IMM12 Jul 2017Corrigendum(s) 1
Corrigendum(s) 2
Corrigendum(s) 3
Sukhoi Engine Division, KoraputHBS/16UD-1023/1-47ThermocoupleIMM12 Jul 2017Corrigendum(s) 1
Corrigendum(s) 2
Corrigendum(s) 3
Facilities Management Division, BangaloreFM/NEP/Advt./33/16-17Providing External power facility to the proposed Ring Rolling facility and Central Material Processing Laboratory (CMPL) Building at Foundry and Forge Division, HAL(BC).Works07 Sep 2017Corrigendum(s) 1
Corrigendum(s) 2
Corrigendum(s) 3
Corrigendum(s) 4
Corrigendum(s) 5
Accessories Division, LucknowPR16-IRG/5/1Spares for Russian Test RigsIMM05 Jul 2017Corrigendum(s) 1
Facilities Management Division, BangaloreFM/NCP/03/17-18Construction of LCH Hangars-Structural Assembly Hangar, Equipping Hangar and Relocation of Power Run area in Helicopter Division, HAL(HC), Bengaluru-[Including Electrical & Mechanical Works].Works10 Jul 2017Corrigendum(s) 1
Corrigendum(s) 2
Corrigendum(s) 3
Aerospace Composites DivisionHAL/ACD/OS/C422LCA-1001 Ver. 02Supply of Composite PartsOutsourcing10 May 2017Corrigendum(s) 1